HOME

CONTACT

 
 

LMK Enterprises, Inc.

T-Liner® Application
 

 

 




 

The Lateral
Restoration Challenge

 

The Problems...
The lateral to the main connection can be the weakest point in a collection system. The picture to the right shows the true extent of the problem. A major structural failure in the crown of the main has occurred adjacent to the lateral. Broken pieces of pipe now lie in the path of flow. The significant offset and joint separation allows for infiltration and sewage ex-filtration. There is no seal at the lateral connection.

 

Animation
Process
Benefits
Contractors

  This also creates an entry portal for root intrusions. Over time a complete collapse of this connection can occur. The solution is the new, proven, robotic, non-disruptive T-Liner.®

 

The products manufactured by LMK Enterprises, Inc. are made in the United States of America.